kerfmaster pin list · UI / workflow decisions
intentWhat we want to build. Never claimed the present, so it cannot be stale — and must never be read as a description of the code.
Content last changed 2026-08-27 — computed from the item itself, not typed.
Intent (Aristide, 2026-08-27, on the 3A76 scan-vs-DWG outcome). Not build authorization — record the design, build later (phase rule).
At file load, the pipeline already knows a lot (raster vs vector, scale provable or not, leader ink touching the outline, callouts that don't reconcile). When that analysis predicts a degraded result, the interface asks before work proceeds — a pop-up prompt was Aristide's sketch. The questions that would have saved the 3A76 round:
Ties to: per-contour override intent, nest↔tooling feedback loop — same principle, the operator decides at the point where the software knows it's guessing.