← back to pin list

QC step 3 — delivery

kerfmaster pin list · Agreed & queued (build after fidelity)

intentmixedWhat we want to build. Never claimed the present, so it cannot be stale — and must never be read as a description of the code.

Content last changed 2026-08-03 — computed from the item itself, not typed.

Contract — QC stage

This contract describes a stage we intend to build — it is NOT a description of the code.

takes topology

makes delivery

fails if Fixes counted on the banner that are not visible on the board.

Contract last changed 2026-08-06 — computed, not typed. Dated separately from the text above, so neither date can speak for the other.

QC_FLAGS + QC_FIX layers in the DXF, red circles on the board, an ‘N auto-fixes applied — review before running’ banner, and the post built from the corrected geometry.

Status: not built. What exists today is the flag half only — QC anomalies are circled on the board (build_board.py:170-173, build_vec_board.py:155-157) and the post is built from the healed geometry. There are no QC_FLAGS or QC_FIX layers in the DXF (they do not exist in the code — see item 10), and no ‘N auto-fixes applied’ banner.